Problem
Cleaning and disinfecting water is a significant cost factor in dairy processing. The client needed a cost-effective way to optimise water disinfection and meet strict national standards.
Voigtländer · Case study
Process water and cleaning application
approx. 100 m³Daily water treated
At a glance
Source: Voigtländer case study.
The application
Anolyte is dosed directly into the main water pipe for dairy process water disinfection. The system stores operating parameters for audits.
3D illustration created with AI Cleaning and disinfecting water is a significant cost factor in dairy processing. The client needed a cost-effective way to optimise water disinfection and meet strict national standards.
The Voigtländer system doses Anolyte directly into the main water pipe, treating about 100 m³ per day. Measurement and control features store operating parameters for audits.
The process
Inlet and water meter, brine tank, the three-chamber generator, anolyte tank, demand-led dosing, measurement and control. Press “Show me the process” to start the animated 3D diagram.

Modelled from the Voigtländer plant schematic of an anolyte system, in the drawing language of the home page. The cards show documented facts only, no invented figures.
Scope of the results
An installation, evaluated within its own operating context.
From reference to your project
This project shows one application. Explore the treatment approach and the decisions that matter before adapting it to your site.
Technical enquiry
Send the operating context and Hydreatio will route the enquiry to the right technical discussion.
Describe your water task and constraints so the right specialist can respond.
Start enquiry ›Dairy process hygieneapprox. 100 m³ · Daily water treated
Discuss your projectHydreatio assistant AI
AI assistant. It can make mistakes, and its answers are not a diagnosis of your plant. For anything further, please use our contact page. Privacy