Reference · Voigtländer · Aviation

Drinking water for aircraft at Macau Airport

CAM (Companhia do Aeroporto de Macau) engaged Voigtländer to secure the quality of the drinking and facilities water supplied to visiting aircraft at Macau, China. The disinfectant is produced on site and the whole system sits in a 20-foot container.

On siteanolyte produced at the airport, not delivered
20 footthe complete system in one container
Aircraftdrinking and facilities water for visiting aircraft
CAMCompanhia do Aeroporto de Macau, the operator

Voigtländer's case study describes this site. The figures describe this installation, not a general performance guarantee.

Water that reaches an aircraft tank

Disinfected water matters at an airport because the water supplied to aircraft tanks has to be safe, clean and free of harmful microorganisms. That protects the health of passengers and crew, meets regulatory standards, avoids operational problems and maintains passenger confidence.

CAM, the operator of Macau International Airport in China, engaged Voigtländer to secure the quality of the drinking and facilities water supplied to visiting aircraft.

A complete system in a 20-foot container

The Voigtländer generator produces the disinfectant, anolyte, on site. The water is treated before it is delivered to the aircraft, so nothing has to be stored or transported to the apron.

The comprehensive system is installed in a 20-foot container. That keeps the plant self-contained and makes the airport independent of deliveries of ready-made disinfectant.

How the concept works

From the mains to the aircraft

  1. 1

    Mains water

    The airport supply is the starting point for drinking and facilities water.

  2. 2

    Generation on site

    The Voigtländer generator produces anolyte from water, salt and electricity.

  3. 3

    Treatment before delivery

    The water is treated before it goes to the aircraft.

  4. 4

    Aircraft supply

    Visiting aircraft are supplied with treated drinking and facilities water.

  5. +

    In a container

    The comprehensive system is installed in a 20-foot container.

Treatment sequence

How water moves from the airport supply to aircraft.

Inlet and water meter, brine tank, the three-chamber generator, anolyte tank, demand-led dosing, measurement and control. Press “Show me the process” to start the animated 3D diagram.

ready

Modelled from the Voigtländer plant schematic of an anolyte system, in the drawing language of the home page. The cards show documented facts only, no invented figures.

Airport context

Macau International Airport

The Voigtländer container treats the water supplied to aircraft on the apron of Macau International Airport.

Aerial view of Macau International Airport with the runway on the waterAI-generated

What the documentation records

Safe water on every departure

Anolyte on siteproduced at the airport by the Voigtländer generator
20-foot containerholds the comprehensive system
Before deliverythe water is treated before it reaches the aircraft
Costs and reliabilitythe documentation records substantially reduced costs and significantly enhanced reliability

Source: Voigtländer case study, Macau. All statements relate to this project.

What this project shows

What this reference shows and what not

Source: Voigtländer case study. All values relate to this site.

What this reference shows

  • That on-site generation can be used at an airport outside Europe, in a self-contained container system.
  • That the water is treated before it is delivered to the aircraft, rather than at the aircraft.

What it does not show

  • Measured values. The documentation for this site records the concept and the benefit, not a table of results.
  • A result for another airport. Fleet, water source, transfer points and operating procedure differ from site to site.

From reference to your project

How this works for your site.

This project shows one application. Explore the treatment approach and the decisions that matter before adapting it to your site.

Your airport

Start with the water path

For a new site, the water path, the transfer points and the measuring points are assessed afresh, beginning with an audit.

No obligationPersonal response after review

+49 89 90 17 39 75

Speak to our team directly

Prefer a conversation to a form? We assess your situation professionally and name the next review step.

Get in touch ›

Send in a water analysis

Already have analysis values? Send them to us, and we will review them and come back with a first assessment.

Send an analysis ›