Voigtländer · Case study

University Hospital Würzburg

HVAC and cooling water hygiene

Installed system, Würzburg

Water taskCooling and HVAC water
Operating sectorHealthcare
System familyVoigtländer water hygiene
Project settingWürzburg, Germany

At a glance

The application and system essentials.

University hospital cooling-water loopTreatment setting
Complete disinfection and biofilm removalCooling-loop result
Redox measurement with stored operating dataControl and audit record

Source: Voigtländer case study.

The application

Effective HVAC disinfection for university clinics

At University Hospital Würzburg, on-site generation and automated dosing support cooling-water hygiene. Redox monitoring records operating data.

Water taskCooling and HVAC water
Treatment routeVoigtländer water hygiene
Read the project details

Problem

At University Hospital Würzburg, the cooling tower was severely contaminated with Legionella. Traditional disinfection required intensive effort and monitoring, while the client needed a permanent solution to reduce contamination risk.

Solution

The Voigtländer system produces Anolyte on site and doses it directly into the cooling system. Redox measurements determine water quality, control dosing and store data for later access.

Results

  • Complete disinfection of the cooling-water loop
  • Biofilm build-up removed
  • Reduced contamination risk and operating cost
  • Healthcare hygiene compliance supported

Project scope

  • HVAC system assessment
  • Disinfection system deployment
  • Redox monitoring setup
  • Long-term contamination control

Project and technology photographs

The technology in real plants.

Photographs of installed Voigtländer systems. They show the same technology, not this site.

University Hospital Würzburg: Dosing pumps with flow measurement. Typical Voigtländer installation, not this site.
Dosing pumps with flow measurement. Typical Voigtländer installation, not this site.
University Hospital Würzburg: Measurement and control of the dosing. Typical Voigtländer installation, not this site.
Measurement and control of the dosing. Typical Voigtländer installation, not this site.
University Hospital Würzburg: Salt store for the generator. Typical Voigtländer installation, not this site.
Salt store for the generator. Typical Voigtländer installation, not this site.

The process

From generator to dosing point, measured throughout

Inlet and water meter, brine tank, the three-chamber generator, anolyte tank, demand-led dosing, measurement and control. Press “Show me the process” to start the animated 3D diagram.

ready

Modelled from the Voigtländer plant schematic of an anolyte system, in the drawing language of the home page. The cards show documented facts only, no invented figures.

Scope of the results

What this project shows and what it cannot promise.

An installation, evaluated within its own operating context.

Shown here

  • Voigtländer water hygiene applied to cooling and HVAC water.
  • Treatment setting: University hospital cooling-water loop
  • Cooling-loop result: Complete disinfection and biofilm removal

Not a general guarantee

  • Results and capacities cannot be transferred to another water composition or operating regime without assessment.
  • Design and expected performance for a new site depend on its own water analysis and process conditions.

From reference to your project

How this works for your site.

This project shows one application. Explore the treatment approach and the decisions that matter before adapting it to your site.

Technical enquiry

Want to compare this case with your site?

Send the operating context and Hydreatio will route the enquiry to the right technical discussion.

Site-specific assessmentTechnical response

+49 89 90 17 39 75

Discuss a comparable installation

Describe your water task and constraints so the right specialist can respond.

Start enquiry ›

Already have water data?

Send the analysis with your site and process context.

Send analysis ›