Rotreat · Case study summary

RCDT reverse osmosis for landfill leachate

A two-stage RCDT XXL system treating 75 m³/day of landfill leachate.

48 hoursTo treat a seasonal surge

Water taskLandfill leachate
Operating sectorWaste management
System familyRotreat RCDT
Project settingTurkey

At a glance

The application and system essentials.

75 m³/dayPlant capacity
two-stage RCDT XXLTreatment system
48 hoursTo treat a seasonal surge

Source: Rotreat project data.

The application

The treatment challenge and RCDT approach

A two-stage RCDT XXL system treating 75 m³/day of landfill leachate. A seasonal surge was treated within 48 hours.

Water taskLandfill leachate
Treatment routeRotreat RCDT
Read the project details
Landfill leachate project in Turkey: RCDT system controls
RCDT system controls

Seasonal load

A seasonal surge of leachate was brought under control within 48 hours.

Technology route

The treatment route is two-stage RCDT XXL, using the Rotreat RCDT equipment family.

Technology visual

RCDT equipment in detail.

The Rotreat RCDT equipment family used for this treatment technology.

Landfill leachate project in Turkey: Rotreat high-pressure pump
Rotreat high-pressure pump
Landfill leachate project in Turkey: RCDT disc tube modules in a Rotreat container
RCDT disc tube modules in a Rotreat container
Landfill leachate project in Turkey: Rotreat switch cabinet and operator panel
Rotreat switch cabinet and operator panel
Landfill leachate project in Turkey: Stainless bag filters ahead of the high-pressure pumps
Stainless bag filters ahead of the high-pressure pumps

The process

From raw water to permeate, step by step

How RCDT reverse osmosis treats a variable, heavily loaded feed. Press “Show me the process” to start the animated 3D diagram.

ready

Drawn from the Rotreat flow sheet of a two-stage RCDT plant with the optional high-pressure concentrate stage. Figures shown are documented manufacturer values.

Scope of the results

What this project shows and what it cannot promise.

An installation, evaluated within its own operating context.

Shown here

  • Rotreat RCDT applied to landfill leachate.
  • To treat a seasonal surge: 48 hours

Not a general guarantee

  • Results and capacities cannot be transferred to another water composition or operating regime without assessment.
  • Design and expected performance for a new site depend on its own water analysis and process conditions.

From reference to your project

How this works for your site.

This project shows one application. Explore the treatment approach and the decisions that matter before adapting it to your site.

Technical enquiry

Want to compare this case with your site?

Send the operating context and Hydreatio will route the enquiry to the right technical discussion.

Site-specific assessmentTechnical response

+49 89 90 17 39 75

Discuss a comparable installation

Describe your water task and constraints so the right specialist can respond.

Start enquiry ›

Already have water data?

Send the analysis with your site and process context.

Send analysis ›